Our Work Portfolio

Learn more about what we do by browsing our completed project portfolio.

Take a look below at the some of the construction projects that IRC has completed.

The project generally consisted of removal and reconstruction of 9,000 TF, 18,000 TF of new construction and installation of 21 mainline common...
The project generally consists of design and construction of a 14,000 foot loop-track grain unloading facility. The design team was challenged to...
IRC performed a design-build of a new railcar repair facility for Alstom Trainlife Services, located on Mare Island in Vallejo, CA. Our work...
IRC performed a design-build of a new unloading facility for Cargill Salt at their Newark, California facility. Our work included the survey,...
IRC performed a full removal and reconstruction of approximately 600' t.f. of existing industrial-lead trackage, located within the old...
IRC performed a design-build (reconstruction) of an existing, older spur track, located at the Flint Ink Facility in West Sacramento, California....
The project generally consisted of 12,000TF of new construction and installation of 25 industrial standard turnouts while working in conjunction with...
IRC and ADM worked together for 2 years designing this new facility in Lodi, CA. This project included the construction of 5 turnouts, 4200 track...
The project generally consisted of design and construction for the removal and reconstruction of over 14 miles of CCTC mainline and siding track...
The Tahoe-Reno Industrial Center (TRI-Center), located in McCarran, Nevada adjacent to the UPRR Mainline approximately halfway between Sparks and...